CASE STUDY · OYU TOLGOI
OT COS Dust Panel Installation
STAIRWAY crews delivered the full dust panel installation package at the Oyu Tolgoi coarse ore stockpile (COS) in 2026 — from foundations to the last panel.

Client: Oyu Tolgoi LLC | Location: Oyu Tolgoi mine, Umnugovi | Year: 2026
The challenge
The COS building needed dust panels installed across a large steel structure on an operating mine site, working at height in Gobi wind and dust, without disrupting production around it.
Our scope
-
Foundation rebar and formwork
-
Steel frame erection
-
Scaffolding design and erection for safe access at height
-
Panel delivery to site
-
Dust panel installation
How we delivered it
One STAIRWAY team handled civil, steel, access and installation works, so there were no hand-offs between contractors. Scaffolding was planned and erected by our own crews, giving safe, inspected access for every lift. All work ran under the site HSE plan with daily pre-start checks.
The result
A complete dust panel enclosure delivered by STAIRWAY crews, reducing dust release from the stockpile area. The project shows our ability to self-perform multi-discipline work on an operating Tier-1 mine.