CASE STUDY · OYU TOLGOI

OT COS Dust Panel Installation

STAIRWAY crews delivered the full dust panel installation package at the Oyu Tolgoi coarse ore stockpile (COS) in 2026 — from foundations to the last panel.

COS dust panel building with scaffolding at the Oyu Tolgoi coarse ore stockpile

Client: Oyu Tolgoi LLC  |  Location: Oyu Tolgoi mine, Umnugovi  |  Year: 2026

The challenge

The COS building needed dust panels installed across a large steel structure on an operating mine site, working at height in Gobi wind and dust, without disrupting production around it.

Our scope

  • Foundation rebar and formwork

  • Steel frame erection

  • Scaffolding design and erection for safe access at height

  • Panel delivery to site

  • Dust panel installation

How we delivered it

One STAIRWAY team handled civil, steel, access and installation works, so there were no hand-offs between contractors. Scaffolding was planned and erected by our own crews, giving safe, inspected access for every lift. All work ran under the site HSE plan with daily pre-start checks.