CASE STUDY · OYU TOLGOI
OT Concentrator Plant – Access & Handrail Works
Inside an operating concentrator, STAIRWAY replaced and upgraded handrails, stair access and steelwork while the plant kept running around us.

Client: Oyu Tolgoi LLC | Location: OT Concentrator Plant, Umnugovi | Year: 2026
The challenge
Handrails and access had to be removed and reinstalled on new beams in live plant areas. Every opening at height had to stay protected, and hot work and lifting had to fit around plant operations.
Our scope
-
Handrail removal and reinstallation on new beams
-
Stair access and steel works
-
Barricading of work areas and open edges
-
Welding and painting
-
Fabrication and lifting support from our camp yard
How we delivered it
Components were fabricated and prepared in our camp yard, then lifted and installed in short, planned work windows to keep time in the live plant to a minimum. Open edges were barricaded at every stage, and welding and painting were completed in place to finish each section.
The result
Safe, upgraded access and handrails in the concentrator, delivered alongside running operations — supported end-to-end by STAIRWAY's own fabrication yard and lifting capability.





